I finally got the CV 1800 set up and closeted and now I'm working on the piping layout. Here is my idea for the tablesaw drop but I'm not quite sure how to size the ducts for the runs to the saw.
I'll have a 6" main and 6" drop from that leading to a wye for runs to the 5" opening in the cabinet below and a Shark guard with a 4" port above. I know that in general you want to keep the duct diameter large as close to the machine as you can. So, should the wye be 6 x6 x 6 with 6" runs (C and D) that reduce at the ports to 5" and 4" or do I get a 6x5x4 wye with 5" and 4" duct to the ports?
I'll have a 6" main and 6" drop from that leading to a wye for runs to the 5" opening in the cabinet below and a Shark guard with a 4" port above. I know that in general you want to keep the duct diameter large as close to the machine as you can. So, should the wye be 6 x6 x 6 with 6" runs (C and D) that reduce at the ports to 5" and 4" or do I get a 6x5x4 wye with 5" and 4" duct to the ports?