From Recommendation to Finished Plan
Duct design determines how a dust collection system performs. That is why our guide to five duct design best practices for industrial dust collection closes with a simple recommendation: don’t guess at what you need. Get a design from the professionals.
But what does a duct design service actually involve, and what should you have ready before you ask for one?
We’ll tell you:
- what we need to get started on your ducting plan
- what we provide
- how long it takes
- what governs the cost
Knowing how the process works means you can gather the right information in one go, settle your layout, and move from planning to installation without surprises.
What the Clear Vue Duct Design Service Covers
Clear Vue offers two levels of duct design: General and Detailed.
Each is built around a Clear Vue cyclone system that you own (or are purchasing). If you have not selected a system yet, no problem: you can still submit your information so we can get started on your ducting plan. The design team will recommend one or more of our cyclones based on your facility, machines, and layout.
| General Ducting Plan | Detailed Ducting Plan | |
|---|---|---|
| What you receive | A high-level view of the recommended run locations | Recommended run locations, recommended duct diameters, a parts list, and estimated pricing using clamp-together steel ducting |
| Fee | No fee | Starting at $300, paid before design begins |
| Average turnaround | 3 to 5 business days | 5 – 10 business days |
| Best suited for | Deciding where the cyclone belongs and how the main runs should travel through the space | Knowing precisely what to order, what diameter ducts you need and where, a parts list, and estimated pricing |
Turnaround times are averages and estimates only, and they may change based on Clear Vue’s current workload.
Step 1
Gather Your Inputs
Both plans begin with a short form, a machine list, and a scaled layout of your space. A complete submission gives the design team what they need to size the system to your needs, so the more details you can give, the better.
Facility Details
Three details have a large impact on the whole design:
- Your ceiling height.
- The height at which you want the centerline of your ductwork to run.
- How many machines you plan to run at the same time, and how often.
The last question is a bit more complicated and deserves a careful answer. Every branch on a shared duct network competes with every other active branch for the same airflow, so the design has to reflect how your operation actually runs. If we tried to design a duct system as if only one machine at a time were running, the system would look very different from one that needs multiple machines running together for hours at a time. It is not enough to know how many machines are on the floor. If necessary, spend some time observing which machines are used together and how often before you fill in the form.
Machine Inventory
For every machine that will connect to the system, record the details below. Measure each dust pick-up opening.
| Field | What to record |
|---|---|
| Location number | A number you will reuse on your layout to cross-reference each machine |
| Machine | The type of machine or your own identifier for it (Table Saw #1, for example) |
| Diameter and number of ports | The diameter of every dust pick-up opening |
| Port location on machine | Where each port sits on the machine |
| Manufacturer’s recommended CFM | Include it if you know it. That helps us when designing the system. |
| Connection type | Flex hose or solid |
Scaled Layout
Provide a scaled drawing of your space that shows each machine and where you hope to put the dust collector (Clear Vue accepts an electronic layout as a JPG, PNG, or PDF). On the drawing, please:
- Use the location numbers from your machine list to mark where each machine is (or will be; it’s good to plan ahead to future installations, if you can).
- Mark a circle where each port is located, or where you want the duct drop.
- Indicate your preferred general routing, such as through the center of the space or around the perimeter.
- Note every obstacle that is in your preferred path, including overhead lighting, support columns and beams, and overhead door tracks.
Your Clear Vue System
Decide which system the plan is for (the CV1700, CV1950 or EF5), along with configuration choices such as filters, external exhaust, motor phase and drum height. Or, if you are still deciding, just say so and the team will make a recommendation from the information you provide.
Step 2
Facility Details That Shape Your Plan
Before you submit, check your layout against the principles the design team works from. Understanding these now makes changes less likely to be needed later.
- Keep ducting to a minimum. Locate the cyclone where the total length of duct is shortest.
- Put demanding machines closest to the collector. Machines with large ports, multiple ports or high dust output belong nearest the cyclone.
- Favor straight lines over turns. Machines arranged along a wall or in a line let the collector work with the ducting more efficiently, and every change of direction reduces airflow.
- Leave room for straight pipe at the collector. We plan for a minimum of 5 feet of straight pipe entering the dust collector, where possible.
- Check obstacles before fixing machine positions. Lighting, columns, beams and door tracks can necessitate turns or bends in the ductwork that would reduce airflow.
- Decide duct height and keep it in mind. Whether ductwork runs above lighting, along the ceiling, above windows or somewhere else, the cyclone has to be placed to accommodate it.
- Place machines carefully. Locations should match where equipment will sit when the facility is running.
For the reasoning behind some of these guidelines, including trunk and branch sizing, fitting selection and balanced airflow, see Five Duct Design Best Practices for Industrial Dust Collection. For the calculation methods behind duct sizing and fitting losses, the ACGIH Industrial Ventilation Manual is a standard reference.
Step 3
What Happens After You Submit
Design and Turnaround
Once Clear Vue Cyclones receives your completed form and layout, the in-house design team drafts your plan. General ducting plans take 3 to 5 business days on average, and detailed plans take 5 to 10 business days on average. Treat these as estimates and build some margin into any project schedule that depends on them.
Payment for Detailed Plans
If you choose a Detailed Ducting Plan, a Clear Vue representative contacts you when your form is processed in order to arrange payment before design begins. The design fee starts at $300, but that initial part of your fee (the first $300) is applied to your ducting order when you place it. If you do not place a ducting order, the design fee is non-refundable and non-transferable. The General Ducting Plan has no fee.
Lock Your Layout Before You Submit
Changes to a machine’s location after design has begun may result in additional charges. You can cancel at any time before design begins for a full refund. That makes submission a useful checkpoint: confirm machine positions with the people responsible for production, maintenance and facilities before you send anything.
What Comes Back
A General Ducting Plan gives you a high-level view of the recommended run locations. A Detailed Ducting Plan adds the recommended duct diameters, a parts list and estimated pricing using clamp-together steel ducting.
Step 4
From Plan to Order
Ducting products ship directly from the manufacturer’s warehouse. Ground shipping is quoted with your design, and expedited shipping is available if you ask. For shipments outside the continental United States, any customs and import fees are the buyer’s responsibility.
Products may be returned within 90 days of the shipping date, with a 25% restocking fee. Custom pieces and certain items cannot be returned, so confirm returnability with a Clear Vue representative.
Six Questions to Ask Any Duct Design Provider
Whichever provider you consider, these six questions clarify what you are buying. Here are the questions and Clear Vue’s answers.
- What do you need from me? A short form, a machine list with measured port sizes and manufacturer’s recommended CFM where known, a scaled layout of your facility and machine locations, your ceiling and duct heights, and how many machines run at once.
- What do I get back? A high-level run layout with the General plan. Run locations, recommended diameters, a parts list and estimated pricing with the Detailed plan.
- How long does it take? On average, 3 to 5 business days for General and 5 – 10 business days for Detailed (these are estimates, not guarantees).
- What does it cost? General duct design is free. Detailed duct design starts at $300, and the first $300 is applied to your ducting order.
- What happens if my layout changes? Moving a machine after design begins may result in additional charges, since the design will need to be altered.
- Do I have to buy your equipment? Clear Vue provides duct design to owners and purchasers of a Clear Vue system, and the plan is built around that system.
Request Your Plan
Start with the free General Ducting Plan to settle where the cyclone and main runs belong, or request a Detailed Ducting Plan when you are ready to price and order ductwork. Email your completed form and layout to sales@clearvuecyclones.com.
Click here for a duct design plan
Explore the CV1700 Dust Collector
Explore the EF5 Dust Collector
Questions? Contact Clear Vue customer service at 888-299-0221 or sales@clearvuecyclones.com.
Frequently Asked Questions
How long does a duct design take?
On average, a General Ducting Plan takes 3 to 5 business days and a Detailed Ducting Plan takes 5 to 10 business days. These are estimates only and may change based on the Clear Vue Cyclones’ Team’s current workload.
How much does a duct design cost?
The General Ducting Plan has no fee. The Detailed Ducting Plan starts at $300, is paid before design begins, and the first $300 is applied to your ducting order. If no ducting order is placed, the design fee is non-refundable.
Do I need to own a Clear Vue collector to request a duct design?
You need to own or be purchasing a Clear Vue cyclone system. If you have not chosen one yet, submit the form anyway. The design team will recommend a system based on your facility details, machines and layout.
What information do I need to submit?
A completed form with your ceiling height, preferred duct centerline height, and how many machines run at the same time and how often; a machine list with port diameters, port locations, manufacturer’s recommended CFM where known, and connection type; and a scaled layout showing machine locations, duct drop locations and obstacles.
What happens if I move a machine after the design has started?
Changes to a machine’s location after design has begun may result in additional charges since it causes the design to be reworked.
Can I submit an electronic layout?
Yes. Clear Vue accepts an electronic layout as a JPG, PNG, or PDF. Email the completed form and layout to sales@clearvuecyclones.com.
What does the Detailed Ducting Plan include that the General Ducting Plan does not?
The General Ducting Plan gives a high-level view of recommended run locations. The Detailed Ducting Plan adds recommended duct diameters, a parts list and estimated pricing using clamp-together steel ducting.